These images show the deployment of the acoustic moorings and other supporting instrumentation from the TAN1605 voyage in June 2016. All images taken on board the R.V. Tangaroa.
Preparing moorings before deployment
CTD rosette deployment
CTD rosette deployment
CTD water sampling
Using GPS locator to identify position of moorings
Acoustic release assembly before deployment
Mapping mooring locations
Preparing mooring floats for deployment
Locating moorings using GPS
Shallow water moorings being prepared for deployment
Shallow water mooring floats and acoustic release assembly being deployed
Placement of shallow moorings and AMAR by seacrane